Establishment of Hydrological Monitoring Network for Khoda-Afarin Dam

This project aimed at establishment of hydrometric stations at up and down-stream of Khoda-Afarin Dam on Aras River in order to enhance optimized operation and management of the Dam. This project includes the selection of proper sites and equipment, design of required structures and supervision of the construction. In the context of this project, flood zoning and estimation of hydraulic characteristics of the flow were carried out.