|
.
|
President |
| |
Gavoshan Dam |
 |
Construction of Gavoshan Rockfill Dam, signed by Mr. Khatami, The President of the Islamic Republic of Iran |
|
| |
Karkheh Dam |
|

|
Construction of Karkheh Earthfill Dam, signed by Mr. Khatami, The President of the Islamic Republic of Iran |
|
| |
Karkheh Hydropower Plant |
|

|
Construction
of
Karkheh
Hydropower
Plant,
signed
by
Mr.
Khatami,
The
President
of
the
Islamic
Republic
of
Iran |
|
| |
Karun III Dam and Hydropower Plant |
|

|
Construction
of
Karun
III
Dam
and
Hydropower
Plant,
signed
by
Mr.
Khatami,
The
President
of
the
Islamic
Republic
of
Iran |
|
...................................................................................................................................
President
|
Clients
|
Ministers | Miscellaneous
|
Clients |
| |
Bandar Abbas Sewerage System |
|

|
Construction of Bandar Abbas Sewerage System, signed by Mr. Rajaee, Head of the BOD and Managing Director of Bandar Abbas Sewage Company |
|
| |
Ahvaz Irrigation and Drainage Network |
|

|
Construction of Irrigation and Drainage Network of Ahvaz Northeast Plain, signed by Mr. Shamsaee, Head of the BOD and Managing Director of Khuzestan Water and Power Authority |
|
| |
Panzdah Khordad Dam |
|

|
Construction of Panzdah Khordad Dam, signed by Mr. Taravat, Head of the BOD and Managing Director of Tehran Regional Water Authority |
|
| |
Ilam Dam |
|

|
Construction of Ilam Dam, signed by Mr. Mirzaee, Head of the BOD and Managing Director of West Regional Water Authority |
|
| |
Tajan Irrigation Network |
|

|
Construction of Tajan Irrigation Network, signed by Mr. Hajrasouliha, Head of the BOD and Managing Director of Mazandaran and Golestan Regional Water Authority |
|
| |
Abadan and Khoamshahr Irrigation and Drainage Network |
|

|
Construction of Abadan and Khoamshahr Irrigation and Drainage Network, signed by Mr. Ebrahimzadeh, Manager of the Great Karun Projects |
|
| |
Typical Detail Drawings for Water and Waste Water Works |
|

|
Preparation of Typical Detail Drawings for Water and Waste Water Works, signed by Mr. Monem, Manager of Standards and Technical Design Criteria Bureau, Ministry of Energy |
|
...................................................................................................................................
President
|
Clients
|
Ministers | Miscellaneous
|
Ministers |
| |
Karun III Dam and Hydropower Plant |
|

|
Construction of Karun III Dam and Hydropower Plant, signed by Mr. Bitaraf Minister of Energy |
|
| |
Persian Gulf Water Supply System |
|

|
Construction of Water Supply System to the cities along Persian Gulf, signed by Mr. Bitaraf Minister of Energy |
|
| |
Water Supply System to Yazd City |
|

|
Construction of Water Supply System to Yazd City from Zayandehrood River, signed by Mr. Manouchehri, Deputy Minister of Energy in Water and Waste Water Affairs, and Managing Director of Water and Waste Water Engineering Company |
|
| |
Shiraz Sewage Treatment Plant |
|

|
Shiraz Sewage Treatment Plant, signed by Mr. Shafie, Deputy Minister of Energy in Water and Waste Water Affairs, and Managing Director of Water and Waste Water Engineering Company |
|
...................................................................................................................................
President
|
Clients
| Ministers | Miscellaneous
|
Miscellaneous |
| |
International Association of the Exchange of Students |
|

|
Contribution to the International Association of the Exchange of Students for Technical Experience |
|
| |
Reconstruction Process of Afghanistan |
|

|
Certificate of Membership for Active Participation in the Reconstruction Process of Afghanistan |
|
| |
Bushehr Nuclear Power Plant |
|

|
Acknowledgement of Gratefulness for Collaboration in Bushehr Nuclear Power Plant |
|
|
|