Water
Supply &
Conveyance
to
Abadan
Island &
Khoramshahr
Client:
Khuzestan
Water
and
Power
Authority
Contractors:
>
Payan Co.
>
Omran Sarasari Co.
>
Kubota Co. (Japan)
>
Ave Co.
>
Faradid Mihan Co.( hydromechanical
facilities)
>
Kerman Tablo Co. ( electrical supplies)
>
Khuzestan Regional Power Supply Co.
>
Pars
Gostar
Co.
Location:
Left
bank of
Karun
River,
from
Abadan
Road
Purpose of the Project:
>
Prevention of saline water intrusion into Bahmanshir River
from Persian Gulf.
>
Supplying fresh water for palm trees in Arvand & Bahmanshir
through Karun River.
>
Supplying water for shrimp production
>
Water Conveyance and irrigation of 16000 hectares of palm
trees located in Abadan, by developing 500 hectares in every
year, total area of irrigated lands will be 25600 hectares.
Project Details & Specifications:
>>
Ma'red intake and pumping station
|
Capacity |
Maximum 120 cms |
|
Number
of electro-pumps |
42 |
|
Type of pumps |
Vertical Submerged |
|
Specification of pumps |
Capacity 3 cms, 120 kW |
|
Dynamic head |
4.54 m |
>>
Ma'red preliminary canal
|
Capacity |
120 cms |
|
Length |
11 km |
|
Bottom
width |
80 m |
|
Height of concrete lining |
6 m |
|
Type of pumps |
Centrifugal volute type pumps
|
|
pipeline |
1279 m
long, 1200 mm diameter steel pipeline |
>>
Passargad bridge
|
Construction location |
Ma'red preliminary canal |
|
Width |
11.6 m |
|
Length |
108 m |
>>
Nejah intake and pumping station
|
Capacity |
Maximum 30 cms |
|
Number
of pumps |
12 |
|
Type of pumps |
Vertical submerged |
|
Specification of pumps |
Capacity 3 cms, 120 KW |
|
Dynamic
head |
4.54 m |
>>
Main Canal
|
Capacity |
|
|
Length |
67 km |
|
Bottom
width |
0.6 m to 23m |
|
Concrete coverage height |
1.8 m to 4.1m |
>>
Secondary pumping stations
|
Number
of stations |
2 |
|
Capacity of each station |
1500 lit/sec |
|
Number
of pumps in each station |
3 |
|
Type of pumps |
Vertical submerged |
|
Specification of pumps |
500 lit/s, 65 kW |
|
Dynamic head |
8.5 m |
|