Purpose of project:
>
Controlled water conveyance from Galabar storage dam to
Zarinabad lands & water distribution.
>
Collection of surface runoff and their disposal
>
Development of water & lands resources agricultural production.
>
Attaining the goals of economical & social development programs
of the country
General features of the project:
Area
|
Development |
7750 hectares |
|
Improvement |
1250 hectares |
|
Total network area |
7900 hectares |
Allocated water volume:
|
Ieje
river water source & existing qanats |
2.1 mcm |
|
Galabar storage dam |
46 mcm |
Irrigation Method
|
Drip |
2036 hectares (vineyard) |
|
Sprinkler |
5864 hectares (agricultural products) |
Project particulars &
Specification:
Galabar
pumping station & transmission line:
|
Capacity |
5700 lit/sec |
|
Number
of electro-pumps |
8+1 |
|
Type of pumps |
Submerged |
|
Electrical power demand |
2880 kW |
|
Total dynamic head |
37 m |
|
Pipeline
length |
106 m |
|
Pipe material type |
Steel |
|
Pipe diameter |
1200 mm |
Galabar Conveyance canal:
|
Capacity |
5700 lit/sec |
|
Length |
6300 m |
|
Bottom
width |
2.5 m |
|
Land coverage height |
2 m |
|
Main structures within canal |
3 units cylindrical siphon with
diameter of 2000 mm and a total length of 1985m |
Irrigation and drainage networks
Consist of main canal, primary and secondary pipelines and
Joghin pump station
Main canal:
|
Capacity |
5.7 m3/sec |
|
Length |
19.2 km |
|
Bottom
width |
2.5 m |
|
Land coverage height |
2 m |
|
Main structures within canal |
3 units cylindrical siphon with
diameter of 2000 mm and a total length of 1985m |
Joghin pump station:
|
Capacity |
1660 lit/sec |
|
Number of electro-pump |
6+1 |
|
Electricity power consumption |
2130 kW |
|
Dynamic head |
87 m |
Primary & Secondary pipelines:
>
2
primary pipelines 9.7 km long
>
17
secondary pipelines 45.5 km long