>>
Water conveyance and distribution to Darband and Bilevar plains
General Specifications:
>>
The area under irrigation network is 30652 hectares
consisting of:
>
6910 hectares of improvement in existing irrigation system.
>
23742 hectares of development of newly irrigated land.
>>
Water allocated for irrigation:
>
239.2 MCM from surface water annually
>
45.7 MCM from groundwater annually
>
33 MCM from return flow
>>
Water supply systems:
>
Gavishan reservoir
>
Gavishan conveyance tunnel
>
Shirvaneh river
>
Razavar diversion dam
>>
Irrigation methods:
>
Surface irrigation
>
Low pressure pipe irrigation
>
Pressurized sprinkler irrigation
Project components:
>>
Razavar diversion dam
>
Concrete free flow ogee spillway 64 m long
>
Water intake capacity 1.5 cms on the right bank and 18 cms on
the left bank
>
17 m long stilling basin
>
Dam height from foundation 8.5 m
>>
Main
canals
>
Discharge capacity 30 to 18 cms
>
Length 87 km
>>
Darband irrigation network
>
Primary and secondary canals 170600 m
>
Main pipelines 45675 m
>
Main drains 31400 m
>
Primary and secondary drains 187600 m
>
Flood control dykes 90110 m
>
Bank stabilization and protection 33910 m