Project lands
consist of Dosalegh, Erayez and Bagheh plains with a total area
of 54196 hectares, from which 14196 hectares is being irrigated
at present and 40000 hectares will be newly irrigated with a
total of 909 MCM allocated from Karkheh reservoir and 198 MCM
from groundwater resources.
The area will
be irrigated gravitationally by surface irrigation, namely,
furrow and border methods.
Special Features:
PMC canal 107
km long with initial capacity of 82 cms, 90 km of protective
dike for diversion of surface runoffs, 18 m deep excavation
along main canal in sandy soil and its slope protection with
concrete blocks as riprap protection, stabilization of sand
dunes with native vegetations and mulching.
Project Components:
>>
Pay-e-Pol Regulating and Diversion Dam:
|
Height from foundation |
34 m |
|
Reservoir
volume |
10.2 MCM |
|
Intake capacity |
82
cms |
>>
Pumping Station:
|
Evan plain No. 1 pumping station with 10
cms discharge capacity, 7 pumps with 2865 kW electrical
power, T.D.H. |
25 m |
|
Evan plain No. 2 pumping stations, with
capacity of 5 cms, 20 pumps with 4575 kW electrical
power, T.D.H. |
64 m |
|
Dosalegh pumping station No. 1, with 5
cms capacity, 14 pumps with 2160 kW electrical power,
T.D.H. |
24 m |
|
Dosalegh pumping station No. 2, with 1.6
cms discharge capacity, 5 pumps with 480 kW electrical
power. |
|
|
Erayez pumping station No. 1 with 4 cms
discharge capacity, 15 pumps, 2700 kW electrical power,
T.D.H. |
40 m |
|
Erayez pumping station No. 2 with 0.60
cms discharge capacity, 3 pumps, 265 kW electrical
power, T.D.H. |
23 m |
|
Bagheh pumping station with 0.87 cms
discharge capacity, 5 pumps, 390 kW electrical power,
T.D.H. |
25 m |
Irrigation System:
>>
Pay-e-Pol main canal 107 km long, with a discharge capacity
of 82 cms in the beginning to 10 cms at the end.
>>
Evan irrigation network:
|
net
irrigated area |
10985
ha |
|
primary
and secondary canals |
119 km |
|
primary,
secondary and diversion drains |
25 km |
>>
Dosalegh irrigation network:
|
net
irrigated area |
13506
ha |
|
primary
and secondary canals |
139 km |
|
primary
and secondary drains & floodways |
167 km |
|
main drains |
37 km |
>>
Erayez irrigation network:
|
net
irrigated area |
23247
ha |
|
primary
and secondary canals |
277 km |
|
primary
and secondary drains & floodways |
2.87
km |
|
main drains |
45 km |
>>
Bagheh irrigation network:
|
net
irrigated area |
6458 ha |
|
primary
and secondary drains |
95 km |
|
main drains |
16 km |