Mahab Ghodss (Consulting Engineering Company)
Mahab Ghodss (Consulting Engineering Company)
 
   

Project

Nesa Irrigation & Drainage Network & Diversion Dam (Narmashir)

 Client:
Kerman Regional Water Authority

Contractors:
Lojanak Construction & Facility Co.
Jahad Nasr of Kerman Province


Location:
Narmashir plain is located in Kerman province, 25 km southeast of Bam.

Objectives:

>>  Proper distribution of water to irrigated land.

>>  Collection, conveyance and discharge of surface runoffs to Koly River by constructing diversion drains and protective dykes.

General Specifications:  

9000 hectares of irrigation network consisting of:
 
. 
  2700 hectares of irrigation improvement.
.   >    6300 hectares of irrigation development.

>>  Irrigation Method:  

4423 hectares irrigated by surface irrigation
4575 hectares irrigated by drip irrigation

>>  water supply:  

141 mcm of irrigation water requirement is supplied from Normashi reservoir annually.
40 mcm of irrigation water is supplied from groundwater resources.

Project Components:

>>  Diversion Dam:

spillway

concrete free flow ogee 119 m  long

Dam height from foundation

 7.2 m

Flood discharge capacity

1291 cms

Length of stilling basin

22 m

Sediment discharge sluiceway

7.4 m  wide

Dikes

50 m  long on the left bank and 930 m  long on the right bank

Maximum intake capacity

8 cms

>>  Conveyance system (main canals):  

 Length of main canals

16320 m

 Capacity

8 cms at the beginning and 3.34 cms at the end.

>>  Irrigation Network:  

 Primary canals

23310 m

Secondary canals

38835 m

 Pressurized pipelines

25000 m

>>  Drainage Network:  

Diversion drains

51000 m

Main drains

10650 m

Primary & secondary drains

46760 m

 385 hydraulic structures

 

<< Back