General Specifications:
>>
Total
irrigated area of 1816 hectares including:
>
696
hectares of improvement in the present irrigation system
>
1120
hectares of newly irrigated lands
>>
11.12
MCM of water is allocated from the reservoir constructed on
Tabarakabad River
>>
Water
is diverted from a diversion dam to the pipe irrigation network
gravitationally
>>
Irrigation
Method:
>
Drip
irrigation for orchard and vineyards
>
Sprinkler
irrigation for newly developed areas
>
Improved
surface irrigation
Project Components:
>>
Diversion
Dam: in the vicinity of Badkhor village
>
Concrete
free flow ogee spillway 51 m long
>
2.7
m high from river bed
>
14
m wide at the base
>
2
m wide bridge over the spillway
>
Sediment
removal sluiceway with a 2.5x1.4 m radial gate
>
Stilling
basin 18 m long
>
Intake
capacity 1648 l/s
>>
Irrigation and Drainage network:
>
Length
of asbestos cement pipes 27.3 km
>
119
hydraulic structures.