Mahab Ghodss (Consulting Engineering Company)
|
|
 | |
|
Tabriz Water
Supply from Zarrineh - Rood
River
Client:
East Azerbaijan
Regional Water Authority
Location:
Northeast
Iran
Water supply
from Zarrineh-rood River and Norouz-lou Dam to Tabriz City
Project Features:
|
Source & Route |
From
Zarrineh-roud River and Norouz-lu Dam-main channel to
the north, terminating at Tabriz City storage reservoir
|
|
Flow Rate |
Totally
5 m3/s (3.3 m3/s for Tabriz City
and the remaining 1.8 m3/s for midway
branches i.e., Bonab, Azarshahr and Miandoab Cities and
other industrial complexes) |
|
Pipeline Length |
180 km
main pipe |
|
Dia. of Pipe |
1800 mm steel
pipe, 63 km
2000 mm
P.C. pipe, 117 km. |
|
Material of Pipe |
Carbon
steel spiral pipe and pre-stressed concrete pipe
|
|
Pipe Protection |
Coal
tar coating/cement lining & cathodic protection for
steel pipes |
|
No. of Pump Stations |
5 units |
|
Pumping Head |
90 m to
140 m |
|
Reservoirs |
15
balancing units 290,000 m3 total capacity |
|
Process |
Water
treatment plant located 10 km from the intake and
intermediate chlorination units along the pipeline |